Our “concrete granite” in AC37

Impressed by the capacity and quality of the marinas, ports and facilities that can be offered to visiting yachts in Barcelona and Catalonia.

So was Grant Dalton, CEO of ACE Barcelona SL and organizer of the Copa América de Vela, who will celebrate his 37 edition from the month of August 2024 in Barcelona.

In MSI the statement of G. Dalton fills us with pride not only for being from Barcelona, sino
for having been part of the engineering companies that have contributed with their floating concrete pontoons to form one of the most reputable marinas as a reference destination in the entire Mediterranean: Marina Port Vell.

In fact, on the occasion of the America's Cup of Sailing, Marina Port Vell has been chosen by more than 40 large boats, superyates, for your mooring during this sporting event.

Shock-absorbing connecting rods holding the concrete pontoon, The great agitation of the site and the poor condition of the dock were the challenge to be overcome in this installation.

Chance?

No, rather:

preferred location: located in the center of the city, with unbeatable views and next to the regatta course.

Flexibility: for example, the floating concrete pontoons that MSI installed in 2013 They have been transferred to one of the bases of the teams that are going to compete and others are going to expand the docks for the mooring of the superyachts in the fishing dock.

Durability: After ten years in service, MSI's floating modules can be used even in busy harbor locations by using shock-absorbing mooring arms. ( DualDocker) that securely connect the jetty to the pier.

Once again it is shown that floating concrete pontoons are a very interesting option in the construction of maritime infrastructures as they are materials of excellent quality., durability, security and flexibility.

Flexible docks that are remodeled to meet new needs that arise in the reorganization of docks such as the one in Barcelona, as well as in any other port that evolves and dreams together with its cities.

The American Magic Team's nautical base uses MSI's concrete jetties and DualDockers
Share